| ENERGY |
| Power Sector Reform-Rural Electrification |
Project: To undertake the study on a) Power Sector Reform assessment, b) financial and managerial issues for NEA, and c) rural electrification development. Location : Nepal, Year : Jan. 2004 to April 2004, Country : Nepal, Funding Agency : Japan Bank of International Development. |
| South Asian Regional Energy Initiative (Sari) |
Project: To provide training for all of the SARI/ETP countries and to promote their working together to understand the benefits of regional energy exchange Location : South Asia Year : Country : Nepal, Funding Agency : USAID. |
| Private Sector Hydropower Development Project – 2 phase |
Project: To strengthen DOED (dept of electricity development) Capacity for implementing hydropower projects under BOOT and to help DOED to critically access the social and environmental conditions during construction of hydropower projects, Location : Kathmandu, Year : 2001 to 2006 August Country : Nepal, Funding Agency : USAID. |
Private Sector Hydropower Development Project 1 phase |
Project: To assess the project proposals and studies undertaken by IPPs, critically looked into the environmental assessment in bringing about ecological balance during and after project implementation and provide training to the DOED personnel in the negotiating skills required for project evaluation and energy pricing, Location : Kathmandu, Year : 1998 to July 2001, Country : Nepal, Funding Agency : USAID |
Middle Marsyangdi Hydropower Project (61 Mw) |
Project: To make detail field-investigations including construction of test audit for updating and study of alternatives to the feasibility study undertaken by Nepal Electricity Authority. Field works management and undertaking of civil designs and cost estimation were integral part of the study, Location: Lamjung District Year : Feb. to June 1998, Country : Nepal, Funding Agency : KFW, Germany. |
| Feasibility Study and Environmental Impact Assessment of Budhi Ganga Hydropower Project (B/G - 0) |
Project: To undertake complete feasibility level design of 20 MW ROR hydropower project including design of access road and 132 kV transmission line and also to. prepare EIA study , Location : Acham District, Far-western Development Region, Year : July 1997 to June 1998, Country : Nepal, Funding Agency : World Bank. |
| Techno-Economic Feasibility Study of Chameliya Hydel Power Project, (30 Mw) |
Project: To undertake detail techno-economic feasibility study of the 30 MW hydropower scheme, access road, 132 kV transmission line and power system study as well as demand forecast, Location : Darchula District, Year : Sept. 1994 to Oct. 1995, Country : Nepal, Funding Agency : CSFRP. |
| Techno-Economic Feasibility Study of Mangde Chhu Hydel Power Project, (20 Mw) |
Project: To undertake detail techno-economic feasibility study of 20 MW hydropower scheme on the Mangde Chhu river . Hydrological forecast, power system analysis, geological investigation, as well as feasibility level design of the civil structures, access road and 132 kV transmission line were also conducted, Location : Mangde Chhu River, Bhutan, Year : Sept. 1994 to Oct.1995, Country : Bhutan, Funding Agency : CSFRP. |
| Dumre - Besishahar Rural Electrification Project
|
Project: To implement rural electrification on the basis of users groups approach where the utility company, NEA, sells energy to the users at the transformer and the rest is handled by the beneficiaries, Location : Lamjung District, Year : Now. 1993 to August 1995, Country : Nepal, Funding Agency : NDF/NEA. |
| Techno-Economic Feasibility Study of Dongdichu Hydel Power Project, (22.4 GWH) Bhutan |
Project: To undertake field reconnaissance survey for the design of the 3.2 MW hydropower scheme in Eastern Bhutan, Location : Trashighang, Eastern Bhutan Year : Sept. to Dec. 1994, Country : Bhutan, Funding Agency : CSFRP. |
| Current Circumstances
of Electric Energy in Nepal
|
Project: To prepare documentation on status of the schemes ongoing and proposed of Power Project and also Transmission Lines above 33 kV along with ongoing and up-coming rural electrification. Location : Nepal, Year : Now. To Dec 2002, Country : Nepal, Funding Agency : JICA. |
| TRANSPORTATION |
| Cost Effectiveness Analysis of Vehicle and Garage Services |
Project: To provide a recommendation on vehicle use and maintenance services based on an efficiency analysis of two alternative options, for DFID Nepal Location : Kathmandu, Year : March 2005 to April 2005, Country : Nepal, Funding Agency : DFID/UK. |
| Sub-regional Corridor Operational Efficiency in the South Asia Sub-region |
Project: To Identify potential transportation needs and its development in the SASEC regions consisting of Nepal, Bhutan, North-east India, and Bangladesh for the smooth flow of goods and personnel for the economic well being of the people living in this region, Location : Bhutan, India, and Bangladesh, Year : Jan 2004 to June 2004, Country : Bhutan, India, and Bangladesh, Funding Agency : Asian Development Bank, ADB-TA 6112-Reg |
| Sanfe Bagar-Ikri Gad Road (9.7 Km) |
Project: To undertake feasibility level design and upgrading study of the road for hydropower construction including an IEE, Location : Kathmandu, Nepal, Year : July 1997 to Dec. 1998, Country : Nepal, Funding Agency : World Bank/NEA. |
| Bji - Bramre Road
(12 Km)
|
Project: To undertake feasibility level design of 12 km of road with cross section at every 50 m, geological investigation and in Tongsa district, Bhutan. An IEE of the project was undertaken, Location : Tongsa, Central Bhutan, Year : Sept. To Dec. 1996, Country : Nepal, Funding Agency : ADB. |
| Gokuleshwor - Bitule Road (19.5 Km) |
Project: To undertake topographical survey, geological investigation and feasibility level design of the 19.5 km road in Baitadi / Darchula districts of Nepal. An Initial Environmental Examination (IEE) also involving social aspects was undertaken, Location : Darchula District, Year : Feb. to June 1995, Country : Nepal, Funding Agency : CSFRP. |
| Road Network Study(Western Nepal) |
Project: To generate road network in the three western development regions of Nepal considering various socio-economic factors with.categorization of different roads into highways, feeder, local farm to market road depending upon various parameters, Location : Western Region of the country, Year : April 1992 to July 1993, Country : Nepal, Funding Agency : Department of Road, HMGN |
| WATER SUPPLY AND SANITATION |
| Strategic Planning for Dept. of Water Supply
and Sanitation |
Project: To review DWSS plans and programmes and its operations with respect to overall assessment of sector policy, institutions and operational strategies to allow for flexibility in optimal use of resources for sustainability, Location : Whole Country, Year : Oct. 1993 to May 1994, Country : Nepal, Funding Agency : ADB.
|
| HYDROLOGY |
| Basin Study of Bagmati and Kamala Rivers |
Project: To estimate water balance in Bagmati & Kamala Water Basins, Location : Central Nepal, Year : Nov. 1996 to May 1997, Country : Nepal, Funding Agency : WECS. |
| Establishment of Integrated Database System
of Surface and Groundwater Hydrology of Kathmandu Valley and its Application |
Project: To prepare database system of surface and groundwater hydrology, Location : Nepal, Year : Feb. to May 1997, Country : Nepal, Funding Agency : DHM. |
| Study of Groundwater Recharge Rate at the Bhabar
Zone and Productivity of Tubewells |
Project: To undertake hydrological study to assess the groundwater recharge rate of Bhabar zone, Location : India Nepal boarder Mid and Far Western Region, Year : March to May 1997, Country : Nepal, Funding Agency : DHM. |